Update 12/2/2023

I’ve given up on the Renogy solar controllers as both the ones I tried have problems. It’s also proven to be a pretty crappy product ecosystem in general and unreliable monitoring. I’ll stick with the DC-DC charger and inverter for now as they both seem to be working fine. I went ahead the replaced the solar charge controller with a Victron MPPT 20 amp controller and so far it’s awesome. Although I have all the panels on this one currently, I’m going to split the single 50 watt panel onto a second controller as it will actually be more efficient.…

Update 11/15/2023

Kinda in a holding pattern as I wait to get my cast off on 11 After that I will work on my van-to-do list then plan to take a trip to Oregon over Christmas.

Van To-Do List

Kinda a note to self of things I still need to do. I’ve been able to do a couple of them despite the cast.

Halloween

I spent Halloween alone as my brain sabotaged an invite to an event I would have loved to go (and worked myself into full anxiety so could not go later), but I dressed up for myself anyway. Did my best having only my left hand to do makeup.